June 14, 2022

LABADI BUNGALOW

This design was inspired inspired by the local character, the natural environment and the movement of the sun throughout the day,  Labadi’s architecture exemplifies timeless quality. The building presents a refined expression of form paired with an authentic and natural material palette that imbues the overall appearance with texture and warmth.

LABADI BUNGALOW Read More »

Twin House Project

Date begun:  November 2019Completion date:  to dateFloor area: 264m²Status: Under construction Budget: N/A In August 2019, the client Mr Ansah contacted epignotects-AD for the development of a semi detached but individualised units for himself and his brother that lived in the Diaspora.The proposed Modern Twin house project was to be developed within a gated residential community at Katamanso. Katamanso

Twin House Project Read More »

N1 Street Villa

Date begun:  2019Completion date:  Ongoing Floor area: 340.69m²Status: Construction stage Budget: N/A  Location: Dzorwulu, Accra-Ghana Introduction: This family residence is a must-have abode for impeccable detail and quality. With wide open spaces and beautiful finishing, be prepared to be captivated from the very first.  Epignotestc-AD was appointed by Mr Charles in January 2019 to develop a 5-bedroom luxury residence with staff outhouse on

N1 Street Villa Read More »

Weija Villa

Date begun:  June 2020Completion date:  Ongoing Floor area: 4,046m²Status: Concept Design Budget: N/A  Epignotects – AD was appointed by the Agyare’s (a Ghanaian Diasporan family) in early July 2020 to transform their newly purchased building at Weija in Accra. The vicinity is already developed with predominantly residential buildings both up and down a steep and rocky slope. The building is an

Weija Villa Read More »